-
Notifications
You must be signed in to change notification settings - Fork 5.9k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
planner: fix new index join build forget to convert cop to root when prop require rootTaskType.
approved
do-not-merge/needs-triage-completed
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#61275
opened May 22, 2025 by
AilinKid
Loading…
1 of 13 tasks
*: refine error message for metrics RetryableErrorCount
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61270
opened May 22, 2025 by
wjhuang2016
Loading…
13 tasks
indexer: copy proto from tici to tidb
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#61266
opened May 22, 2025 by
wshwsh12
Loading…
13 tasks
grafana: add ru usage for tiflash query
approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#61261
opened May 22, 2025 by
guo-shaoge
Loading…
1 of 13 tasks
executor: add an unalignment load test for hash join v2
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61257
opened May 22, 2025 by
windtalker
Loading…
2 of 13 tasks
server: return a default flen when unspecified
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61254
opened May 22, 2025 by
xhebox
Loading…
1 of 13 tasks
planner: code refactoring for readability after AI test review
do-not-merge/needs-linked-issue
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
planner: add MPPSink interface for later MPP CTE support
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61252
opened May 21, 2025 by
winoros
Loading…
1 of 12 tasks
ddl: construct separate tasks for different temp indexes
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#61250
opened May 21, 2025 by
tangenta
Loading…
2 of 13 tasks
expression: deduplicate the args of IN function | tidb-test=pr/2518
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#61249
opened May 21, 2025 by
winoros
Loading…
1 of 13 tasks
workload-learning: Extract metrics from cluster statements stats
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
executor: replace logutil with statslogutil for improved logging in the analyze process
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61245
opened May 21, 2025 by
0xPoe
Loading…
1 of 13 tasks
planner: refactor physical optimization to receive group as parameter and enumerate plans based on group
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#61244
opened May 21, 2025 by
AilinKid
Loading…
2 of 13 tasks
br: compatibility of log backup and log restore
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#61238
opened May 21, 2025 by
Leavrth
Loading…
1 of 13 tasks
domain: add retry on pd failure for InfoSyncer (fix #61132)
do-not-merge/needs-triage-completed
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#61236
opened May 21, 2025 by
NaturezzZ
Loading…
1 of 13 tasks
executor: update internal mpp tasks waitReport time from 3s to 100ms
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#61235
opened May 21, 2025 by
yibin87
Loading…
1 of 13 tasks
planner: fix primary index hint when isolation read engine is tiflash
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61234
opened May 21, 2025 by
lilinghai
Loading…
1 of 13 tasks
*: remove Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
StatementContext
from CommonHandleCols
to fix a bug caused by shallow clone in plan cache (#61182)
do-not-merge/cherry-pick-not-approved
needs-1-more-lgtm
#61232
opened May 21, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
planner: Support brief format for Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
explain for connection
approved
do-not-merge/needs-tests-checked
needs-1-more-lgtm
#61230
opened May 21, 2025 by
King-Dylan
Loading…
13 tasks
planner: fix wrong cost with tiflash late materialization
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#61229
opened May 21, 2025 by
hawkingrei
Loading…
1 of 13 tasks
executor: fix wrong statistic from memory tracker in hash agg (#60653)
do-not-merge/cherry-pick-not-approved
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#61228
opened May 21, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
planner: remove useless code
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
skip-issue-check
Indicates that a PR no need to check linked issue.
#61227
opened May 21, 2025 by
hawkingrei
Loading…
1 of 13 tasks
br: fix table filter nil pointer issue
approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/needs-triage-completed
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#61225
opened May 21, 2025 by
Tristan1900
Loading…
1 of 13 tasks
test: [DNM] Test test task manager entry size
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
*: update the version of client_go;add tests for Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
ErrResultUndetermined
handling
release-note-none
#61221
opened May 20, 2025 by
lcwangchao
Loading…
1 of 13 tasks
Previous Next
ProTip!
Add no:assignee to see everything that’s not assigned.