Skip to content

CNTRLPLANE-945: WIP: Add tests for ExternalOIDC #29917

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Draft
wants to merge 7 commits into
base: main
Choose a base branch
from

Conversation

everettraven
Copy link
Contributor

No description provided.

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Jun 12, 2025
Copy link
Contributor

openshift-ci bot commented Jun 12, 2025

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

Copy link
Contributor

openshift-ci bot commented Jun 12, 2025

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: everettraven
Once this PR has been reviewed and has the lgtm label, please assign smg247 for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@everettraven everettraven changed the title WIP: Add tests for ExternalOIDC CNTRLPLANE-945: WIP: Add tests for ExternalOIDC Jun 12, 2025
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Jun 12, 2025
@openshift-ci-robot
Copy link

openshift-ci-robot commented Jun 12, 2025

@everettraven: This pull request references CNTRLPLANE-945 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.20.0" version, but no target version was set.

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

Signed-off-by: Bryce Palmer <[email protected]>
@everettraven
Copy link
Contributor Author

/test all

Signed-off-by: Bryce Palmer <[email protected]>
Signed-off-by: Bryce Palmer <[email protected]>
@everettraven
Copy link
Contributor Author

/test all

Signed-off-by: Bryce Palmer <[email protected]>
@everettraven
Copy link
Contributor Author

/test all

Copy link
Contributor

openshift-ci bot commented Jul 2, 2025

@everettraven: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-aws-ovn-fips 5d8b755 link true /test e2e-aws-ovn-fips
ci/prow/e2e-azure-ovn-upgrade 5d8b755 link false /test e2e-azure-ovn-upgrade
ci/prow/e2e-gcp-disruptive 5d8b755 link false /test e2e-gcp-disruptive
ci/prow/e2e-gcp-ovn 5d8b755 link true /test e2e-gcp-ovn
ci/prow/e2e-metal-ipi-ovn-kube-apiserver-rollout 5d8b755 link false /test e2e-metal-ipi-ovn-kube-apiserver-rollout
ci/prow/e2e-metal-ipi-ovn-dualstack-local-gateway 5d8b755 link false /test e2e-metal-ipi-ovn-dualstack-local-gateway
ci/prow/e2e-aws-ovn-serial-publicnet-2of2 5d8b755 link false /test e2e-aws-ovn-serial-publicnet-2of2
ci/prow/e2e-aws-ovn-single-node-serial 5d8b755 link false /test e2e-aws-ovn-single-node-serial
ci/prow/e2e-aws-ovn-single-node-upgrade 5d8b755 link false /test e2e-aws-ovn-single-node-upgrade
ci/prow/verify 5d8b755 link true /test verify
ci/prow/e2e-metal-ipi-serial-ovn-ipv6-1of2 5d8b755 link false /test e2e-metal-ipi-serial-ovn-ipv6-1of2
ci/prow/e2e-azure-ovn-etcd-scaling 5d8b755 link false /test e2e-azure-ovn-etcd-scaling
ci/prow/e2e-metal-ipi-serial-2of2 5d8b755 link false /test e2e-metal-ipi-serial-2of2
ci/prow/e2e-aws-ovn-serial-publicnet-1of2 5d8b755 link false /test e2e-aws-ovn-serial-publicnet-1of2
ci/prow/e2e-metal-ipi-virtualmedia 5d8b755 link false /test e2e-metal-ipi-virtualmedia
ci/prow/e2e-aws-ovn-edge-zones 5d8b755 link true /test e2e-aws-ovn-edge-zones
ci/prow/e2e-aws-ovn-single-node 5d8b755 link false /test e2e-aws-ovn-single-node
ci/prow/e2e-vsphere-ovn-upi 5d8b755 link true /test e2e-vsphere-ovn-upi
ci/prow/e2e-gcp-fips-serial-2of2 5d8b755 link false /test e2e-gcp-fips-serial-2of2
ci/prow/okd-scos-e2e-aws-ovn 5d8b755 link false /test okd-scos-e2e-aws-ovn
ci/prow/e2e-gcp-ovn-etcd-scaling 5d8b755 link false /test e2e-gcp-ovn-etcd-scaling
ci/prow/e2e-openstack-serial 5d8b755 link false /test e2e-openstack-serial
ci/prow/okd-e2e-gcp 5d8b755 link false /test okd-e2e-gcp
ci/prow/e2e-aws-ovn-cgroupsv2 5d8b755 link false /test e2e-aws-ovn-cgroupsv2
ci/prow/e2e-aws-proxy 5d8b755 link false /test e2e-aws-proxy
ci/prow/e2e-vsphere-ovn-etcd-scaling 5d8b755 link false /test e2e-vsphere-ovn-etcd-scaling
ci/prow/e2e-vsphere-ovn-dualstack-primaryv6 5d8b755 link false /test e2e-vsphere-ovn-dualstack-primaryv6
ci/prow/e2e-aws-disruptive 5d8b755 link false /test e2e-aws-disruptive
ci/prow/e2e-gcp-fips-serial-1of2 5d8b755 link false /test e2e-gcp-fips-serial-1of2
ci/prow/e2e-openstack-ovn 5d8b755 link false /test e2e-openstack-ovn
ci/prow/e2e-aws-ovn 5d8b755 link false /test e2e-aws-ovn

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Copy link

openshift-trt bot commented Jul 2, 2025

Job Failure Risk Analysis for sha: 5d8b755

Job Name Failure Risk
pull-ci-openshift-origin-main-e2e-azure-ovn-upgrade Medium
Job run should complete before timeout
This test has passed 96.51% of 3980 runs on release 4.20 [Overall] in the last week.

Signed-off-by: Bryce Palmer <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants