Skip to content

Pull requests: openshift/origin

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

fix call fmt.Errorf with wrong error needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#29650 opened Apr 4, 2025 by alingse Loading…
TRT-2061: Test disable etcd log analyzer approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29649 opened Apr 3, 2025 by neisw Draft
Revert "Add monitortest for elevated etcd disk fsync intervals" approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#29648 opened Apr 3, 2025 by dgoodwin Loading…
gateway object test case for gatewayApiController vendor-update Touching vendor dir or related files
#29646 opened Apr 3, 2025 by melvinjoseph86 Loading…
TRT-2061: backport 4.18 approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29645 opened Apr 2, 2025 by neisw Loading…
NE:1970 e2e origin tests for gatewayApiController vendor-update Touching vendor dir or related files
#29644 opened Apr 2, 2025 by rhamini3 Loading…
[WIP] Automation creation of OCP-80983 do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29640 opened Apr 2, 2025 by asahay19 Loading…
OCPEDGE-1675: feat: update some tests to account for the arbiter node jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29639 opened Apr 2, 2025 by eggfoobar Loading…
sample of gatewayapicontroller e2e tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. vendor-update Touching vendor dir or related files
#29638 opened Apr 2, 2025 by lihongan Draft
Trt 2061 throttle monitor startup refactor approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29637 opened Apr 1, 2025 by neisw Draft
Draft Commit for gatewayAPIController featuregate do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29636 opened Apr 1, 2025 by rhamini3 Draft
TRT-2061: brute throttling approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29635 opened Apr 1, 2025 by neisw Draft
Add communication matrix test under networking vendor-update Touching vendor dir or related files
#29633 opened Apr 1, 2025 by shirmoran Loading…
[release-4.18] Stabilize IPsec E2E tests
#29632 opened Apr 1, 2025 by pperiyasamy Loading…
NO-JIRA: Env override NETWORKING_E2E_BOND_MTU jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29630 opened Mar 31, 2025 by mgencur Loading…
WIP CNTRLPLANE-353: Add test which verifes that only short duration tests are present do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29629 opened Mar 31, 2025 by vrutkovs Loading…
TRT-2049: Track Watch Counts via Audit Events approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29628 opened Mar 28, 2025 by neisw Loading…
WIP: write to nodeLogs instead of e2e logs do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29627 opened Mar 27, 2025 by rphillips Loading…
[release-4.12] OCPBUGS-54147: Add/remove team members to the OWNERS file for Builds approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#29622 opened Mar 24, 2025 by openshift-cherrypick-robot Loading…
OCPBUGS-37799: Disable:Broken for [sig-builds][Feature:Builds][Slow] can use private repositories as build input build using an HTTP token should be able to clone source code via an HTTP token jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29621 opened Mar 24, 2025 by kunalmemane Loading…
etcd fsync intervals approved Indicates a PR has been approved by an approver from all required OWNERS files.
#29620 opened Mar 22, 2025 by dgoodwin Loading…
MCO-1599: MCN impersonation tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29619 opened Mar 21, 2025 by pablintino Draft
SDN-5217: Add EgressIP route advertisement test jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. vendor-update Touching vendor dir or related files
#29617 opened Mar 21, 2025 by pliurh Loading…
Allow multiple attempts in egress firewall test needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#29615 opened Mar 21, 2025 by ldoktor Loading…
TLS 1.3 / Modern profile tests
#29611 opened Mar 19, 2025 by jacobsee Loading…
ProTip! Type g p on any issue or pull request to go back to the pull request listing page.