Skip to content

Merge pull request #3 from Bilb/fix-use-member-status-enum #13

Merge pull request #3 from Bilb/fix-use-member-status-enum

Merge pull request #3 from Bilb/fix-use-member-status-enum #13

Triggered via push November 25, 2024 05:28
Status Cancelled
Total duration 1m 12s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (macos-12)
Canceling since a higher priority waiting request for 'libession-util-nodejs build test' exists
build (macos-12)
The operation was canceled.
build (windows-2022)
Canceling since a higher priority waiting request for 'libession-util-nodejs build test' exists
build (windows-2022)
The operation was canceled.
build (ubuntu-20.04)
Canceling since a higher priority waiting request for 'libession-util-nodejs build test' exists
build (ubuntu-20.04)
The operation was canceled.