Minimal Acceptance Tests #589
Triggered via workflow run
June 9, 2025 06:09
reactive-firewall
completed
1e90003
Status
Failure
Total duration
53s
Artifacts
–
CI-MATs.yml
on: workflow_run
Annotations
9 errors
check_build
Process completed with exit code 1.
|
MATS (3.13)
Process completed with exit code 1.
|
MATS (3.13)
Process completed with exit code 1.
|
MATS (3.10)
Process completed with exit code 1.
|
MATS (3.10)
Process completed with exit code 1.
|
MATS (3.10)
The strategy configuration was canceled because "MATS._3_13" failed
|
MATS (3.12)
The operation was canceled.
|
MATS (3.12)
The strategy configuration was canceled because "MATS._3_13" failed
|
MATs_SUMMARY
Process completed with exit code 1.
|