Skip to content

EPIC: Vulcan Modernization Strategy - Long-term Platform Evolution #675

Open
@aaronlippold

Description

@aaronlippold

EPIC: Vulcan Modernization Strategy - Long-term Platform Evolution

Overview

Strategic Goal: Modernize Vulcan platform to enterprise standards with scalable architecture, modern technology stack, and enhanced capabilities.

Target Timeline: 6-12 months across multiple phases
Priority: STRATEGIC - Long-term platform evolution

Vision Statement

Transform Vulcan from a functional Rails application to a modern, enterprise-ready platform that rivals tools like Heimdall2 in capabilities while maintaining security and compliance standards.

Strategic Objectives

  • 🏗️ Modern Infrastructure: Ruby 3.2+, Rails 7+, Node.js 20+, heroku-24
  • 🎨 Modern Frontend: Vue 3, TypeScript, modern asset pipeline
  • 🔧 Enterprise Configuration: Runtime settings, admin interfaces, feature flags
  • 📊 Enhanced Operations: Monitoring, logging, performance optimization
  • 🔒 Security Enhancement: Modern authentication, authorization, audit trails

Phase Overview

🚨 Phase 1: Critical Infrastructure (EPIC #674)

Status: IN PROGRESS
Timeline: 2-3 weeks
Current Focus: Issue #676 - rails-settings-cached migration

🎯 Phase 2: Enterprise Configuration Management

Status: PLANNED
Timeline: 2-3 weeks (after Phase 1)

🎨 Phase 3: Frontend Modernization

Status: RESEARCH
Timeline: 4-6 weeks

  • Issue TBD: Vue 2 → Vue 3 Migration
    • TypeScript integration
    • Composition API adoption
    • Modern build tooling
    • Component library standardization

📊 Phase 4: Operations and Monitoring

Status: PLANNED
Timeline: 2-3 weeks

  • Issue TBD: Enhanced Monitoring and Observability
    • Application performance monitoring
    • Enhanced logging and audit trails
    • Health checks and diagnostics
    • Performance optimization

🔒 Phase 5: Security and Compliance Enhancement

Status: PLANNED
Timeline: 3-4 weeks

  • Issue TBD: Security Infrastructure Modernization
    • Enhanced authentication flows
    • Role-based access control improvements
    • Security audit and compliance reporting
    • Automated security scanning

Current State Analysis

✅ Completed Foundation Work

  • OIDC Auto-discovery: Implement OIDC auto-discovery to simplify configuration #667 ✅ (modern authentication)
  • Comprehensive Environment Variables: Documentation complete
  • Research and Planning: Architecture decisions documented
  • Documentation Organization: Structured docs/ with decision records, guides, architecture ✅

🔄 In Progress

📋 Planned

Success Metrics

Technical Metrics

  • Ruby 3.2+ and Rails 7+ in production
  • Modern asset pipeline with sub-second build times
  • Vue 3 with TypeScript for type safety
  • Zero-restart configuration changes
  • < 2s page load times across all interfaces

Enterprise Metrics

  • Web-based administration interface
  • Bulk operations for user and content management
  • Feature flags enabling safe deployments
  • Comprehensive audit trails
  • Multi-environment configuration management

Developer Experience Metrics

  • < 30s local development setup
  • < 5s asset rebuild times
  • Comprehensive test coverage with fast execution
  • Clear separation of concerns in codebase
  • Modern debugging and development tools

Related Issues and Dependencies

Foundation Issues

Current Blockers

Future Enhancements

  • Vue 3 migration planning
  • Performance optimization initiatives
  • Security enhancement roadmap

Technical Architecture Vision

┌─────────────────────────────────────────────────────────────┐
│                     Vulcan Platform                        │
├─────────────────────────────────────────────────────────────┤
│ Frontend: Vue 3 + TypeScript + Modern Asset Pipeline       │
├─────────────────────────────────────────────────────────────┤
│ Backend: Rails 7+ + Ruby 3.2+ + PostgreSQL               │
├─────────────────────────────────────────────────────────────┤
│ Configuration: Database-backed + Admin UI + Feature Flags  │
├─────────────────────────────────────────────────────────────┤
│ Infrastructure: heroku-24 + Modern Monitoring + Security   │
└─────────────────────────────────────────────────────────────┘

Documentation and Knowledge Management

Decision Records

Implementation Guides

Architecture Documentation

Current Immediate Focus

Priority 1: Complete Issue #676 (rails-settings-cached migration)
Priority 2: Continue EPIC #674 (Heroku-20 EOL resolution)


Immediate Focus: EPIC #674 - Heroku-20 EOL Resolution
Current Work: Issue #676 - Configuration System Modernization
Labels: epic, modernization, strategic, long-term
Estimated LOE: 6-12 months across 5 major phases

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions