Description
EPIC: Vulcan Modernization Strategy - Long-term Platform Evolution
Overview
Strategic Goal: Modernize Vulcan platform to enterprise standards with scalable architecture, modern technology stack, and enhanced capabilities.
Target Timeline: 6-12 months across multiple phases
Priority: STRATEGIC - Long-term platform evolution
Vision Statement
Transform Vulcan from a functional Rails application to a modern, enterprise-ready platform that rivals tools like Heimdall2 in capabilities while maintaining security and compliance standards.
Strategic Objectives
- 🏗️ Modern Infrastructure: Ruby 3.2+, Rails 7+, Node.js 20+, heroku-24
- 🎨 Modern Frontend: Vue 3, TypeScript, modern asset pipeline
- 🔧 Enterprise Configuration: Runtime settings, admin interfaces, feature flags
- 📊 Enhanced Operations: Monitoring, logging, performance optimization
- 🔒 Security Enhancement: Modern authentication, authorization, audit trails
Phase Overview
🚨 Phase 1: Critical Infrastructure (EPIC #674)
Status: IN PROGRESS
Timeline: 2-3 weeks
Current Focus: Issue #676 - rails-settings-cached migration
- Documentation Organization: Structured docs/ directory with decision records, guides, architecture
- Replace settingslogic with rails-settings-cached for Ruby 3+ compatibility #676: Replace settingslogic with rails-settings-cached ⭐ IN PROGRESS
- EPIC: Heroku-20 EOL Resolution - Critical Infrastructure Fixes #674: Heroku-20 EOL Resolution - Critical Infrastructure Fixes
- Configuration system modernization (settingslogic → rails-settings-cached)
- Asset pipeline modernization (Webpacker → jsbundling-rails)
- Ruby platform upgrade (3.0.6 → 3.2.8)
- heroku-24 deployment migration
🎯 Phase 2: Enterprise Configuration Management
Status: PLANNED
Timeline: 2-3 weeks (after Phase 1)
- Implement Enterprise Runtime Configuration Management #673: Enterprise Runtime Configuration Management
- ActiveAdmin interface implementation
- Database-backed settings with web UI
- Feature flags with Flipper
- Bulk operations and user management
🎨 Phase 3: Frontend Modernization
Status: RESEARCH
Timeline: 4-6 weeks
- Issue TBD: Vue 2 → Vue 3 Migration
- TypeScript integration
- Composition API adoption
- Modern build tooling
- Component library standardization
📊 Phase 4: Operations and Monitoring
Status: PLANNED
Timeline: 2-3 weeks
- Issue TBD: Enhanced Monitoring and Observability
- Application performance monitoring
- Enhanced logging and audit trails
- Health checks and diagnostics
- Performance optimization
🔒 Phase 5: Security and Compliance Enhancement
Status: PLANNED
Timeline: 3-4 weeks
- Issue TBD: Security Infrastructure Modernization
- Enhanced authentication flows
- Role-based access control improvements
- Security audit and compliance reporting
- Automated security scanning
Current State Analysis
✅ Completed Foundation Work
- OIDC Auto-discovery: Implement OIDC auto-discovery to simplify configuration #667 ✅ (modern authentication)
- Comprehensive Environment Variables: Documentation complete
- Research and Planning: Architecture decisions documented
- Documentation Organization: Structured docs/ with decision records, guides, architecture ✅
🔄 In Progress
- Critical Infrastructure: EPIC EPIC: Heroku-20 EOL Resolution - Critical Infrastructure Fixes #674 (heroku-24 compatibility)
- Configuration Migration: Issue Replace settingslogic with rails-settings-cached for Ruby 3+ compatibility #676 (settingslogic → rails-settings-cached)
📋 Planned
- Enterprise Features: User feedback from Enterprise use case and Environmental variables #654 driving requirements
- Frontend Modernization: Vue 3 migration research
- Operational Excellence: Monitoring and performance optimization
Success Metrics
Technical Metrics
- Ruby 3.2+ and Rails 7+ in production
- Modern asset pipeline with sub-second build times
- Vue 3 with TypeScript for type safety
- Zero-restart configuration changes
- < 2s page load times across all interfaces
Enterprise Metrics
- Web-based administration interface
- Bulk operations for user and content management
- Feature flags enabling safe deployments
- Comprehensive audit trails
- Multi-environment configuration management
Developer Experience Metrics
- < 30s local development setup
- < 5s asset rebuild times
- Comprehensive test coverage with fast execution
- Clear separation of concerns in codebase
- Modern debugging and development tools
Related Issues and Dependencies
Foundation Issues
- Heroku-20 Stack EOL + Webpacker Compatibility Blocking All Deployments #670: JSBundling Migration Research and Analysis ✅
- Ruby and NodeJS need updating to current 3.x and NodeJS 20+ #638: Ruby and NodeJS need updating to current 3.x and NodeJS 20+
- Enterprise use case and Environmental variables #654: Enterprise use case and Environmental variables ✅
Current Blockers
- EPIC: Heroku-20 EOL Resolution - Critical Infrastructure Fixes #674: Heroku-20 EOL Resolution (CRITICAL - must complete first)
- Replace settingslogic with rails-settings-cached for Ruby 3+ compatibility #676: settingslogic → rails-settings-cached migration (IN PROGRESS)
Future Enhancements
- Vue 3 migration planning
- Performance optimization initiatives
- Security enhancement roadmap
Technical Architecture Vision
┌─────────────────────────────────────────────────────────────┐
│ Vulcan Platform │
├─────────────────────────────────────────────────────────────┤
│ Frontend: Vue 3 + TypeScript + Modern Asset Pipeline │
├─────────────────────────────────────────────────────────────┤
│ Backend: Rails 7+ + Ruby 3.2+ + PostgreSQL │
├─────────────────────────────────────────────────────────────┤
│ Configuration: Database-backed + Admin UI + Feature Flags │
├─────────────────────────────────────────────────────────────┤
│ Infrastructure: heroku-24 + Modern Monitoring + Security │
└─────────────────────────────────────────────────────────────┘
Documentation and Knowledge Management
Decision Records
- Documentation Organization - ADRs and technical decisions
- Vulcan Modernization Roadmap
- Workstream Implementation Plan
- Design Decisions
Implementation Guides
- Development Guides - Implementation and operational guides
- JSBundling Migration Guide
- Enterprise Configuration Setup
Architecture Documentation
- System Architecture - High-level system design
Current Immediate Focus
Priority 1: Complete Issue #676 (rails-settings-cached migration)
Priority 2: Continue EPIC #674 (Heroku-20 EOL resolution)
Immediate Focus: EPIC #674 - Heroku-20 EOL Resolution
Current Work: Issue #676 - Configuration System Modernization
Labels: epic, modernization, strategic, long-term
Estimated LOE: 6-12 months across 5 major phases