es_out: support Upstream Servers with configuration overriding #11864
Triggered via pull request
June 11, 2025 22:48
Status
Cancelled
Total duration
1h 0m 30s
Artifacts
–
unit-tests.yaml
on: pull_request
Matrix: run-ubuntu-unit-tests
Matrix: run-aarch64-unit-tests
Matrix: run-macos-unit-tests
Matrix: run-qemu-ubuntu-unit-tests
Unit tests (matrix)
4s
Annotations
5 errors
run-ubuntu-unit-tests (-DFLB_JEMALLOC=On, 3.31.6, gcc, g++)
The operation was canceled.
|
run-ubuntu-unit-tests (-DFLB_JEMALLOC=On, 3.31.6, gcc, g++)
The job has exceeded the maximum execution time of 1h0m0s
|
run-ubuntu-unit-tests (-DFLB_SIMD=Off, 3.31.6, clang, clang++)
The operation was canceled.
|
run-ubuntu-unit-tests (-DFLB_SIMD=Off, 3.31.6, clang, clang++)
The job has exceeded the maximum execution time of 1h0m0s
|
Unit tests (matrix)
Process completed with exit code 1.
|