Skip to content

es_out: support Upstream Servers with configuration overriding #11864

es_out: support Upstream Servers with configuration overriding

es_out: support Upstream Servers with configuration overriding #11864

Triggered via pull request June 11, 2025 22:48
Status Cancelled
Total duration 1h 0m 30s
Artifacts

unit-tests.yaml

on: pull_request
Matrix: run-ubuntu-unit-tests
Matrix: run-aarch64-unit-tests
Matrix: run-macos-unit-tests
Matrix: run-qemu-ubuntu-unit-tests
Unit tests (matrix)
4s
Unit tests (matrix)
Fit to window
Zoom out
Zoom in

Annotations

5 errors
run-ubuntu-unit-tests (-DFLB_JEMALLOC=On, 3.31.6, gcc, g++)
The operation was canceled.
run-ubuntu-unit-tests (-DFLB_JEMALLOC=On, 3.31.6, gcc, g++)
The job has exceeded the maximum execution time of 1h0m0s
run-ubuntu-unit-tests (-DFLB_SIMD=Off, 3.31.6, clang, clang++)
The operation was canceled.
run-ubuntu-unit-tests (-DFLB_SIMD=Off, 3.31.6, clang, clang++)
The job has exceeded the maximum execution time of 1h0m0s
Unit tests (matrix)
Process completed with exit code 1.