fix: return handleCommitRequest early if already hydrated #40193
ci-build.yaml
on: pull_request
changes
16s
Ensure Go modules synchronicity
21s
Lint Go code
3m 23s
Check changes to generated code
5m 10s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
10m 3s
E2E Tests - Composite result
2s
Process & analyze test artifacts
Annotations
12 errors and 1 warning
Lint Go code
issues found
|
Lint Go code:
commitserver/commit/commit.go#L122
Error return value of `json.Unmarshal` is not checked (errcheck)
|
Run end-to-end tests (v1.32.1, true)
The operation was canceled.
|
Run end-to-end tests (v1.32.1, true)
Canceling since a higher priority waiting request for Integration tests-refs/pull/22646/merge exists
|
Run end-to-end tests (v1.31.0, false)
The operation was canceled.
|
Run end-to-end tests (v1.31.0, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/22646/merge exists
|
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
|
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/22646/merge exists
|
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
|
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/22646/merge exists
|
E2E Tests - Composite result
Process completed with exit code 1.
|
Integration tests
Canceling since a higher priority waiting request for Integration tests-refs/pull/22646/merge exists
|
Build & cache Go code
Cache not found for keys: Linux-go-build-v1-14415373259
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
race-results
|
1.31 MB |
sha256:fd0cbc6b9cf22fcd59c6d7dc8203dfa33ed1696c58d6d9267fe25e4aead81851
|
|
test-results
|
1.3 MB |
sha256:c560c1067c4a1e92acc4f5257dcab7bf6d7b38bafd883ff62da9fb658f67d799
|
|