chore(deps): bump github.com/jarcoal/httpmock from 1.3.1 to 1.4.0 (#2… #40055
ci-build.yaml
on: push
changes
6s
Ensure Go modules synchronicity
26s
Lint Go code
20s
Check changes to generated code
28s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
0s
E2E Tests - Composite result
2s
Process & analyze test artifacts
0s
Annotations
12 errors and 1 warning
Build, test & lint UI code
The operation was canceled.
|
Build, test & lint UI code
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
Lint Go code
The operation was canceled.
|
Lint Go code
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
Build & cache Go code
The operation was canceled.
|
Build & cache Go code
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
Ensure Go modules synchronicity
The operation was canceled.
|
Ensure Go modules synchronicity
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
Check changes to generated code
The operation was canceled.
|
Check changes to generated code
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
E2E Tests - Composite result
Process completed with exit code 1.
|
Integration tests
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
|
Build & cache Go code
Cache not found for keys: Linux-go-build-v1-14306238595
|