Skip to content

fix: fix demo

fix: fix demo #1897

Triggered via pull request May 21, 2025 12:31
Status Cancelled
Total duration 2m 18s
Artifacts 1

ci.yml

on: pull_request
Matrix: E2E Tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Lint
Process completed with exit code 1.
E2E Tests (@write)
The operation was canceled.
E2E Tests (@write)
The run was canceled by @vincentchalamon.
Tests
The operation was canceled.
Tests
The run was canceled by @vincentchalamon.
CI
The run was canceled by @vincentchalamon.
E2E Tests (@read)
The operation was canceled.
E2E Tests (@read)
The run was canceled by @vincentchalamon.

Artifacts

Produced during runtime
Name Size Digest
api-platform~demo~KQJ6PI+2.dockerbuild
177 KB
sha256:b9b97f3b4421c016306ce25f8091affcc907170cad5a27515bf923fa60d5ff7a