Skip to content

Add OTP 28 to CI

Add OTP 28 to CI #848

Triggered via pull request June 10, 2025 11:53
Status Failure
Total duration 31s
Artifacts

elixir.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

25 errors
Elixir 1.19 / OTP 27
Process completed with exit code 1.
Elixir 1.18 / OTP 26
The operation was canceled.
Elixir 1.18 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.18 / OTP 25
The operation was canceled.
Elixir 1.18 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.17 / OTP 27
The operation was canceled.
Elixir 1.17 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.17 / OTP 25
The operation was canceled.
Elixir 1.17 / OTP 26
The operation was canceled.
Elixir 1.17 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.17 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.15 / OTP 25
The operation was canceled.
Elixir 1.15 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.19 / OTP 28
The operation was canceled.
Elixir 1.18 / OTP 27
The operation was canceled.
Elixir 1.18 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.19 / OTP 28
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.16 / OTP 26
The operation was canceled.
Elixir 1.16 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.19 / OTP 26
The operation was canceled.
Elixir 1.19 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.16 / OTP 25
The operation was canceled.
Elixir 1.16 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.15 / OTP 26
The operation was canceled.
Elixir 1.15 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed