Add OTP 28 to CI #848
Annotations
25 errors
Elixir 1.19 / OTP 27
Process completed with exit code 1.
|
Elixir 1.18 / OTP 26
The operation was canceled.
|
Elixir 1.18 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.18 / OTP 25
The operation was canceled.
|
Elixir 1.18 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.17 / OTP 27
The operation was canceled.
|
Elixir 1.17 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.17 / OTP 25
The operation was canceled.
|
Elixir 1.17 / OTP 26
The operation was canceled.
|
Elixir 1.17 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.17 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.15 / OTP 25
The operation was canceled.
|
Elixir 1.15 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.19 / OTP 28
The operation was canceled.
|
Elixir 1.18 / OTP 27
The operation was canceled.
|
Elixir 1.18 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.19 / OTP 28
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.16 / OTP 26
The operation was canceled.
|
Elixir 1.16 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.19 / OTP 26
The operation was canceled.
|
Elixir 1.19 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.16 / OTP 25
The operation was canceled.
|
Elixir 1.16 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
|
Elixir 1.15 / OTP 26
The operation was canceled.
|
Elixir 1.15 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
|