Skip to content

Merge pull request #4 from Triteras/dependabot/npm_and_yarn/follow-re… #30

Merge pull request #4 from Triteras/dependabot/npm_and_yarn/follow-re…

Merge pull request #4 from Triteras/dependabot/npm_and_yarn/follow-re… #30

Triggered via push January 28, 2025 13:32
Status Failure
Total duration 11h 59m 39s
Artifacts

node.js.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (16.x)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
build (16.x)
The operation was canceled.
build (14.x)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
build (14.x)
The operation was canceled.
build (18.x)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
build (18.x)
The operation was canceled.