This repository was archived by the owner on Mar 27, 2025. It is now read-only.
-
Notifications
You must be signed in to change notification settings - Fork 6
Update Germany specific costs (NEP, onwind, pellets) #193
Merged
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
419bbd7
to
29c4a8d
Compare
for more information, see https://pre-commit.ci
for more information, see https://pre-commit.ci
Validator ReportI am the Validator. Download all artifacts here.
|
NRMSE | Pearson | |
---|---|---|
Investment|Energy Supply|Electricity|Biomass|w/o CCS | 597268853.477 | 0.000 |
Investment|Energy Supply|Heat|Biomass|w/o CCS | 597268853.477 | 0.000 |
Capacity Additions|Electricity|Biomass|w/o CCS | 61626.319 | 0.989 |
Capacity Additions|Heat|Biomass|w/o CCS | 61578.289 | 0.989 |
Capacity|Hydrogen|Gas|w/o CCS | 1991.208 | -0.796 |
Capacity|Hydrogen|Gas | 28.004 | -0.626 |
Capacity Additions|Electricity|Biomass | 5.020 | -0.064 |
Capacity Additions|Electricity|Biomass|Solids | 5.020 | -0.064 |
Capacity Additions|Heat|Biomass | 4.291 | -0.040 |
Capacity|Electricity|Gas|OC | 3.787 | 1.000 |
Investment|Energy Supply|Electricity|Biomass|Solids | 2.871 | -0.180 |
Investment|Energy Supply|Heat|Biomass | 2.871 | -0.180 |
Investment|Energy Supply|Electricity|Biomass | 2.871 | -0.180 |
Secondary Energy Input|Hydrogen|Gases | 2.559 | 0.365 |
Investment|Energy Supply|Electricity|Gas|OC | 2.360 | 1.000 |
Capacity|Gases|Hydrogen | 2.334 | 0.310 |
Capacity Additions|Gases|Hydrogen | 2.334 | 0.310 |
Capacity|Electricity|Gas|w/ CCS | 2.173 | 0.243 |
Capacity Additions|Electricity|Gas|w/ CCS | 2.173 | 0.243 |
Primary Energy|Nuclear | 2.149 | 1.000 |
Secondary Energy|Electricity|Nuclear | 2.051 | 1.000 |
NRMSE: Normalized (min-max) Root Mean Square Error
Pearson: Pearson correlation coefficient
Threshold: NRMSE > 2
Only variables reaching the threshold are shown. Find the equivalent plot for all of them below.
General
Files comparison
Status | NRMSE | MAE (norm) | |
---|---|---|---|
csvs/nodal_capacities.csv | |||
csvs/nodal_costs.csv | |||
csvs/nodal_cfs.csv | |||
csvs/nodal_supply_energy.csv | |||
csvs/cfs.csv | ✅ Almost equal | 0.054 | 0.02 |
csvs/costs.csv | ✅ Almost equal | 0.003 | 0.02 |
csvs/curtailment.csv | ✅ Almost equal | 0.000 | 0.11 |
csvs/price_statistics.csv | ✅ Almost equal | 0.021 | 0.31 |
csvs/market_values.csv | ✅ Almost equal | 0.061 | 0.04 |
csvs/cumulative_cost.csv | ✅ Almost equal | 0.004 | 0.10 |
csvs/metrics.csv | ✅ Almost equal | 0.006 | 0.12 |
csvs/capacities.csv | ✅ Almost equal | 0.000 | 0.01 |
csvs/prices.csv | ✅ Almost equal | 0.029 | 0.01 |
csvs/supply_energy.csv | ✅ Almost equal | 0.002 | 0.02 |
csvs/supply.csv | ✅ Almost equal | 0.004 | 0.02 |
csvs/energy.csv | ✅ Almost equal | 0.003 | 0.01 |
csvs/weighted_prices.csv | ✅ Equal |
NRMSE: Normalized (min-max) Root Mean Square Error
MAE (norm): Mean Absolute Error on normalized Data (min-max
Status Threshold: MAE (norm) > 0.05 and NRMSE > 2
Model Metrics
Comparing update-wind-and-nep-costs
(d592c6e) with main
(7e36af1).
Branch is 6 commits ahead and 1 commits behind.
Last updated on 2024-09-13 12:50:30 CEST
.
toniseibold
pushed a commit
that referenced
this pull request
Sep 23, 2024
* for offwind use cost of 1 see 1 land inverter, instead of 2 land inverters * update NEP and offwind costs * [pre-commit.ci] auto fixes from pre-commit.com hooks for more information, see https://pre-commit.ci * modify pelletizing costs and onwind investments * rename * [pre-commit.ci] auto fixes from pre-commit.com hooks for more information, see https://pre-commit.ci --------- Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
Sign up for free
to subscribe to this conversation on GitHub.
Already have an account?
Sign in.
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Hopefully for the last time. Firstly, all NEP costs have been updated / double-checked. Most importantly, the offwind cable costs are now more accurate (and lower) and the offwind station costs are more expensive. Interestingly, underground cables in NEP23 are cheaper than in NEP 21 (when correcting for inflation)
The new costs are:
Sources:
NEP 21 Kostenschätzung
NEP 21 offshore, Tabelle 16/17
NEP 23 Kostenschätzung
NEP 23 offshore, Tabelle 24/25
Before asking for a review for this PR make sure to complete the following checklist:
ariadne_all
completes without errorsexport_ariadne_variables
has been adapted to the changesChangelog.md
main
has been merged into the PRYYYYMMDDdescriptive_title