Skip to content

chore: Update skaffold deps to prepare for skaffold 2.15. #8930

chore: Update skaffold deps to prepare for skaffold 2.15.

chore: Update skaffold deps to prepare for skaffold 2.15. #8930

Triggered via pull request March 28, 2025 20:18
Status Failure
Total duration 3m 10s
Artifacts

integration-linux.yml

on: pull_request
Matrix: PR integration tests (linux)
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 4 warnings
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 1): vendor/github.com/google/ko/pkg/commands/options/build.go#L195
cannot use useYAMLTagsAndUnmarshallers (variable of type func(c *"github.com/mitchellh/mapstructure".DecoderConfig)) as viper.DecoderConfigOption value in argument to v.UnmarshalKey
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 0)
The job was canceled because "_5_5_0_0_17_1_1_34_0_1__2" failed.
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 0): vendor/github.com/google/ko/pkg/commands/options/build.go#L195
cannot use useYAMLTagsAndUnmarshallers (variable of type func(c *"github.com/mitchellh/mapstructure".DecoderConfig)) as viper.DecoderConfigOption value in argument to v.UnmarshalKey
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 3)
The job was canceled because "_5_5_0_0_17_1_1_34_0_1__2" failed.
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 3): vendor/github.com/google/ko/pkg/commands/options/build.go#L195
cannot use useYAMLTagsAndUnmarshallers (variable of type func(c *"github.com/mitchellh/mapstructure".DecoderConfig)) as viper.DecoderConfigOption value in argument to v.UnmarshalKey
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 2)
The job was canceled because "_5_5_0_0_17_1_1_34_0_1__2" failed.
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 2): vendor/github.com/google/ko/pkg/commands/options/build.go#L195
cannot use useYAMLTagsAndUnmarshallers (variable of type func(c *"github.com/mitchellh/mapstructure".DecoderConfig)) as viper.DecoderConfigOption value in argument to v.UnmarshalKey
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 1)
The process '/usr/bin/git' failed with exit code 128
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 0)
The process '/usr/bin/git' failed with exit code 128
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 3)
The process '/usr/bin/git' failed with exit code 128
PR integration tests (linux) (5.5.0, 0.17.1, 1.34.0, 1.0.0-beta.55, 1.34.0, 502.0.0, 1.19.3, 21, 2)
The process '/usr/bin/git' failed with exit code 128