You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
HI,
when I "push again" a failed job, I think that then the parent_id should be filled in, right?
Or am I mistaken on what this attribute does?
And besides this, will it be tracked on the failed job that it now has run correctly via a re-push?
Otherwise it will be difficult to check which jobs have never been run successfully.
Thanks,
gb5256
The text was updated successfully, but these errors were encountered:
HI,
when I "push again" a failed job, I think that then the parent_id should be filled in, right?
Or am I mistaken on what this attribute does?
And besides this, will it be tracked on the failed job that it now has run correctly via a re-push?
Otherwise it will be difficult to check which jobs have never been run successfully.
Thanks,
gb5256
The text was updated successfully, but these errors were encountered: